Heating and Cooling
Ductwork will be installed for the HVAC, heating, ventilation and air conditioning system (or pipes if you are getting a hydronic unit). The heating and cooling ducts/pipes are being installed, while the insulation is installed in the walls, ceilings, and floors.
Electrical
As the roofing continues, your home is considered as dried in. Your electrician will install the receptacles for lights, switches, and outlets and will run some wires from the breaker panel to every receptacle. Wiring for cable TV, telephones as well as music systems are also included in this part of work.
Rough framing, electrical and plumbing, as well as mechanical systems, are being inspected for compliance along with building codes. Most of the times, there will be 3 different inspections. The framing inspection at the very least will be done individually from the mechanical and electrical inspections. During this stage of the home construction process, drywall, which is also known as gypsum board, wallboard and plasterboard is sent to the building site.
Interior Finishes
One of the most exciting aspects of new home construction is when you are able to design and choose all the items, which go inside of every room. This includes appliances, countertops, cabinets, floorings, millwork, lighting fixtures, trim, plumbing products, interior doors, and so much more.
You will have a lot of choices and options to choose from for flooring, wall paint, countertops, fixtures, lighting, and all the other touches, which give your home an identity and character. A lot of choices will be done at the base price of the home and some might need you to pay extra.
Mineral wool bats, rolls and fiberglass are typically installed in the attics, sidewalls, crawl spaces, basements and cathedral ceilings. Most of the times, manufacturers attach a facing like foil-kraft paper or just kraft-paper to act as an air barrier or vapor barrier. In certain areas wherein the insulation is left exposed like batts and basement walls, the batts often have an exclusive flame-resistant facing.
Installing of Exterior Walkways and Driveways - as Well as Doors and Windows
Interior doors, door casings, baseboards, stair blusters, window sills and other decorative trim must be installed too, together with fireplace mantels, vanities, surrounds, and cabinets. Walks get a finish coat of paint at the same time is wallpapered where needed. Typically, exterior walkways, patio, and driveways are done at this stage. A lot of builders want to wait until the end of every project prior to pouring the driveway as the heavy equipment like drywall delivery truck could damage the concrete. However, some builders were able to pour the driveway right away as the base is done so that whenever the homeowners visit the site, they will not get their shoes dirty with mud.
These are the basics. There is obviously much more to it, but to really protect yourself contact us to perform an 11th Month Builder Warranty Inspection!